Factory Acceptance Test (FAT)

dot ilustration

Our projects are fully engineered and factory tested at INTEA premises.

During FAT all necessary tests are carried out to verify that the complete delivery is in accordance with contract specifications and requirements.

All system's properties and functions (HW and SW) are checked against documented, customized test procedures. All test results are recorded in HW and SW test protocols.

The tests include at least the following:
  • visual inspection,
  • voltage withstand test and insulation test,
  • functional tests,
  • redundancy checks, if applicable
  • full demonstration of application software.

Final FAT certificates are issued.