23.04.2017.
PLIVA - Zagreb, "AC110 to AC800M" - upgrade of ABB automation system commissioned.
INTEA has successfully commissioned upgrade of ABB "AdvantController 110", installed in electrical substation TS-5, Pliva, Prilaz baruna FilipoviŠa 25 - Zagreb - Croatia.

27.02.2017.
Djibouti - "DPP Boulaos - 4 x AC110 to AC160 Upgrade" - upgrade of ABB automation system commissioned.
INTEA has successfully completed upgrade of four ABB "AdvantController 110", installed in Djibouti's largest diesel power plant - Boulaos.

13.01.2017.
Tanzania - HPP Kihansi: automation system upgrade commissioned
INTEA has successfully completed upgrade of ABB automation system, installed in Tanzania's second largest hydro power plant - Kihansi.

14.11.2016.
Turn-key automation solution - from design to start-up
Successfully commissioned steel mill auxiliary plant's automation system. INTEA has delivered: automation system (controllers + HMI), MCC, drives, low voltage distribution and local control boxes. Project activities included: electrical design, integration, programming, testing and commissioning.

21.04.2016.
OFIG IvaniŠ Grad - ABB DCS upgrade commissioned
INTEA has successfully completed and commissioned upgrade of automation system, installed in gas treatment plant OFIG/ETAN. Only 36 hours of down time was allowed.